Ruston, Louisiana
Client :: Louisiana Tech University Foundation :: Ruston, Louisiana
Award :: Engineering News Record (ENR) "Best Projects of 2018" Award of Merit-Sports/Entertainment
Time constraints played a significant role in this Design/Build project for Louisiana Tech. It was imperative that Lincoln Builders’ construction be completed between football seasons. With 10 months to surgically remove the existing press box a mere 3” from the stadium and construct the new facility 85 feet in the air, Lincoln’s early involvement allowed our team to begin constructing deep foundations that fell outside the perimeter of the existing facility while the football season got underway. This allowed demolition of the existing to begin the day after the last game, reducing the overall project delivery by more than two months.
“Lincoln Builders exceeded our expectations on the finished product. They communicated with us on such a frequent basis that we felt as though we were one team working on this project together.”
Thomas H. McClelland, II
Former Director of Athletics, Louisiana Tech University
More info on this project: https://bit.ly/2aJK9RC :: https://bit.ly/2EDoV4Z